The Challenge
ADS had renovated a new building on the Team Valley, but it wasn't ready for the company's IT. Existing cabling was poor quality, some areas had none at all, and loose wires around the building were both a safety hazard and unprofessional for visiting clients.
ADS had suffered major downtime during a previous office move, so getting this one right was a priority.
Wiring the building properly and looking smart was a priority for the new site. The existing wiring looked unprofessional draped down in corners of the room so I desperately wanted that organising efficiently.
Adam Clare, ADS Ltd




